Small concrete job in Cockeysville

  • February 9, 2024
  • Cockeysville, Maryland, United States
  • Created at: February 5, 2024

Gig Description

pouring three concrete posts (holes already dug) and setting 3 light bollard base hardware LEVEL and PLUM. Precision inserting the anchor bolted bases in the concrete critically important. I already have the 3 sonatubes cut to 2’ lengths. I estimate 8 83 lb bags of concrete mix is needed  [email protected] 443-326-5961


Gig Location

Map is approximate to keep gig creator location private.