Need 750 sq.ft. basement finished (Rockville)
- December 26, 2020
- Rockville, Maryland, United States
- Created at: December 24, 2020
Gig Description
Hello, I am looking to finish a 750sq.ft. basement that includes a bathroom and laundry.
Finish materials are ready.
Contractor to provide labor and building materials.
Ready to start immediately.
SCOPE OF WORK
- Re-enforce the subfloor under the main level, with blocking through each joist using 2x6 wooden blocks.
- Reinforce the backing of the stairs and prep for carpet install.
- Install a landing at the bottom of the stairs.
- Cut out additional HVAC vents and a return in the duct work as necessary.
- Install new framing to the perimeter of the basement and additional walls to separate the bathroom, office, closets, laundry, utility area per design layout approved by the customer.
- Rough-in electric wiring for electrical outlets throughout basement to code.
- Wire and install 16 new recessed light fixtures throughout the basement. (Recessed lights provided by customer).
- Wire and install one new smoke/carbon monoxide detector per code.
- Install new sheetrock onto all exposed walls/ceiling framing except in the furnace area.
- Rough-in drain and water supply plumbing to accommodate a new bathroom and laundry.
- Bathroom finishing:
o Rough-in wiring and install a new GFCI outlet, vanity light fixture and an exhaust fan vented to fresh air.
o Build a new concrete shower base to accommodate a walk-in shower.
o Rough-in and install a new shower faucet.
o Install new cement boards onto the shower walls up to the ceiling.
o Install new moisture resistant sheetrock onto the rest of exposed framing in the bathroom.
o Install new tiles and grout onto the bathroom floor and shower walls, up to the ceiling.
o Install new threshold and baseboards.
o Install new toilet.
o Install new vanity cabinet, top, sink and faucet.
o Install new mirror and vanity light fixture.
o Install new bathroom accessories, such as toilet paper holder, towel racks etc.
o Rough-in two pocket doors into the bathroom.
o Seal all newly installed tiles and grout after 48 hours from installation.
- Rough-in and install a new washer and dryer with vent to fresh air.
- Rough-in and install new doors, two pocket doors into the bathroom, French doors into gym, louvered doors into laundry, all closets, louver utility and storage under stairs.
- Install new baseboards to the perimeter of the areas being finished.
- Install new handrails, to match upstairs handrails and banisters.
- Mud, prime and paint all newly installed sheetrock, trims, baseboards and doors.
- Remove and dispose of the work debris and broom clean the worked on area.