Verified
Not Verified
Not Reached
New toilet will be delivered tomorrow outside of the house. Sometime between 8 am and 8 pm. Will also need the old one hauled away. Toilet is on the 2nd floor. Old toilet or original from when the house was built in 1992. New toilet shown below.
Created at: a month ago