Not Verified
Verified
Not Reached
I have a 6x 12 entryway with cement board down already. Needs to be tiled. Tile is on site.
Created at: 8 months ago
I am redoing an entry way and have done the demo down to the plywood subfloor. Unfortunately there is an obvious slant to it. I want it leveled and prepped for tiling. It may need a new subfloor and the joists shimmed to level it or a leveling compound poured. I would pay for materials needed.
Created at: 9 months ago